A selection of recent work completed by the Recharge Renewable team
These completed installation records represent a selection of solar, battery, and EV charging work carried out recently by the Recharge Renewable team. Each listing is based on real installations completed across Somerset and includes the service type, location, date, and engineer involved. Together, these records give a practical view of the renewable energy work we undertake and the areas we cover.
External Lighting Review Completed in Farrington Gurney
Lighting infrastructure review completed for clubhouse and external grounds areas in Farrington Gurney. Existing lighting circuits, supply routes, duct access points, and proposed installation positions were assessed alongside aerial site photography and layout documentation.
Service type
Lighting Review
Location
Farrington Gurney, Bristol
Date completed
23/01/2026
Technician name
Harrison Weekes
Solar PV System Installed in Locking Parklands
Solar PV and battery storage installation completed at a domestic property in Locking Parklands, Weston-Super-Mare. The project included the installation of six solar panels, a hybrid inverter, a battery storage system, Solar DB, bird protection mesh, and associated electrical works following a site survey assessment.
Service type
Home Solar Panels with Battery Storage
Location
Locking Parklands, Somerset
Date completed
07/01/2026
Technician name
Taylor Scandrett
Solar PV and Battery System Commissioned in Norton Malreward
Solar PV, battery storage and EV charging infrastructure were installed at a detached residential property in Norton Malreward. The project included roof-mounted solar equipment, new fuse boards, inverter commissioning, EV charger setup, and a subsequent inverter warranty replacement, with final operational checks completed.
Service type
Home Solar Panels with Battery Storage
Location
Norton Malreward, Avon, VIC
Date completed
04/02/2026
Technician name
Harrison Weekes, James Attwood
Solar PV System Installed in Swindon
Solar photovoltaic panels, battery storage and fuseboard upgrade works were completed at a residential property in Swindon. Installation included solar panel mounting, hybrid inverter installation, battery storage integration, distribution board replacement, and a whole-property electrical inspection upon completion.
Service type
Home Solar Panels with Battery Storage
Location
Swindon, Wiltshire
Date completed
27/02/2026
Technician name
Taylor Scandrett
Solar PV and Battery Installation Completed in Tarnock
Solar PV, EPS and battery installation completed at a residential property in Tarnock. The work included in-roof panel installation, hybrid inverter installation, battery installation and associated EPS system works.
Service type
Home Solar Panels with Battery Storage
Location
Tarnock
Date completed
07/05/2026
Technician name
Harrison Weekes
Post Light Operation Restored in Plymouth
Electrical fault attendance completed at a venue building in Plymouth following reports of a post light transformer fault and alarm beeping near the reception area. The post light transformer was replaced and re-terminated, damaged plug components were repaired, and the source of the alarm beeping was identified during site attendance.
Service type
Appliance Installation
Location
Plymouth
Date completed
12/03/2026
Technician name
Finley Williams
Myenergi Zappi EV Charger Installed in Chard
EV charger installation completed at a residential property in Chard using a Myenergi Zappi GLO tethered charging system. The work included EV consumer unit installation, charger configuration, app connection and test charging following commissioning.
Service type
Home EV Charging
Location
Chard
Date completed
24/03/2026
Technician name
Finley Williams
Garden Shed Electrical Supply Installed in Bristol
Garden shed electrical supply installation completed at a residential property in Bristol. The work included SWA cable installation, out-house DB installation, socket installation, and bulkhead lighting, all supplied through the completed electrical distribution setup.
Service type
Appliance Installation
Location
Bristol, Avon
Date completed
27/04/2026
Technician name
James Attwood, Taylor Scandrett
Solar, DMEV, and Electrical Works Completed in Rooksbridge Walk
Solar installation, DMEV works, new electrical supplies and fuseboard upgrade works were completed at CURO-8 Rooksbridge Walk. The completed scope included internal and external works, with certification activities allocated to RiskBase, SC, EIC, and PV documentation.
Service type
Home Solar Panels
Location
Rooksbridge Walk
Date completed
13/04/2026
Technician name
Harrison Weekes, Reuben Young, Finley Williams
Hybrid Solar and Battery Installation Planned in Street
Hybrid solar and battery installation works were assessed and specified for a detached residential property in Street. Roof orientation, shading conditions, inverter placement, battery storage requirements, and scaffold access needs were reviewed before a system configuration and installation scope were prepared.
Service type
Home Solar Panels with Battery Storage
Location
Street
Date completed
21/05/2026
Technician name
Harrison Weekes